1 Project
For Keller HCW, the scope of deliveries and services
for this project covered engineering, manufacturing, erection and commissioning of shaping, setting, handling and packing installations as well as the building of a second tunnel dryer and a second tunnel kiln.
A really big challenge was the integration of the new plant into the existing plant. The existing plant already had a wet storage, a tunnel dryer, a holding room, and a tunnel kiln and was now extended with a separate tunnel dryer and a tunnel kiln.
Source Ziegelindustrie International